Natural Geography
Administrative Division、Area and Population
Synthesis Economy
Industry
Agriculture
Commerce and Trade
Foreign Trade
Utilization of Foreign Capital
Six Bases
Six Carriers
Six Large Projects
Transportation
Energy
Telecommunication
Construction of Irrigation Works
Environment Protection
Municipal Construction
Jieyang Tourism
 
 
 

首页>>english>>正文

 
Energy

        There are five 220 – kv transformer substations, thirty –one 110 –kv transformer substations and 2 wind – energy power stations, which has formed the power net with 220 –kv transformer lines as its backbone and 110 – kv transformer lines as its assistants. The No.1 generation set of Huilai Power Plant, which is planned to be invested with 40 billion RMB, is under operation, No.2 generating set will be finished for operation and No.3 and 4 generating sets are being prepared for construction. The geology and earthquake investigation of the nuclear energy power station in Wushi has been finished and the project has been finished and the project has entered the period of feasibility research. The joint – venture of LNG station, had invested with over 60 billion RMB, will be set up and 5 satellite station will be built soon. The 500 – kv Rongjiang transformer substation and the Fuzifeng, Tieshan 220 – kv transformer substations are under construction.


陈奕威调研交通公路工作 把揭阳打
中电投集团与揭阳合作开发能源及
卢光霖调研揭阳潮汕机场 要求加快
省抗震救灾先进事迹报告会今天在
畅叙鱼水情谊 共商发展大计