Natural Geography
Administrative Division、Area and Population
Synthesis Economy
Industry
Agriculture
Commerce and Trade
Foreign Trade
Utilization of Foreign Capital
Six Bases
Six Carriers
Six Large Projects
Transportation
Energy
Telecommunication
Construction of Irrigation Works
Environment Protection
Municipal Construction
Jieyang Tourism
 
 
 

首页>>english>>正文

 
Municipal Construction

        4 bridges of Rongjiang River, Rongdong, Meidong and Huanshi North River have been built and the roadways are increased to 103 with 124 km from 11 with 16.2 km when the city was set up. The virescence rate of the urban is 32.24 % and the average green ground for per person accumulates to 5.05 square meters. The overall plan of the 50 – km/sq new urban is nearly finished and the city is introducing investment for construction. The construction of the municipal defense synthesis projects with its assistant municipal facilities, which is planned to be invested with 3 billion RMB, is being sped up. The Huangzhishan Mountain Forest Park and the large musical spring on the Rongjiang River have been finished. The construction of the first phase of garbage – ground and the reform of the Linjiang North Road and the Huangzhishan Street have nearly been completed. The reform of the old urban is carried out steadily and the built area in the urban has been expanded to 36 sq/km from 7.8 sq/km before the city was set up. The 181 – sq/km planned area of the downtown is under construction and Jieyang, as a newly developed middle city, has appeared to be a largevisage.


陈奕威调研交通公路工作 把揭阳打
中电投集团与揭阳合作开发能源及
卢光霖调研揭阳潮汕机场 要求加快
省抗震救灾先进事迹报告会今天在
畅叙鱼水情谊 共商发展大计